Gold Mining

Keep oxygen from becoming a process constraint.

Plan a dependable on-site oxygen supply around process demand, site conditions, backup strategy, engineering documentation, and project approvals.

Why teams start looking

Common reasons teams begin reviewing oxygen supply

  • Delivered oxygen cost or logistics are becoming difficult.
  • A new mine, plant expansion, or process change creates sustained oxygen demand.
  • Existing equipment is losing pressure or purity.
  • Service, maintenance, or spare-parts support is not meeting operational needs.
  • An EPC or engineering firm requires a documented, jurisdiction-ready specification package.

Define the oxygen need

Build a shared picture of the requirement

A complete intake captures what oxygen is for, how much is needed, when it is needed, and what the site can support. Use this as a starting point for your internal team and for Benchmark Oxygen Solutions.

  • Where oxygen is used in the process
  • Continuous and peak demand
  • Required pressure and purity
  • Site altitude and ambient conditions
  • Power availability
  • Redundancy and backup
  • Controls and monitoring
  • Documentation, FAT, commissioning, and certifications

Compare supply strategies

No single answer fits every site

Delivered oxygen and LOX

Liquid oxygen trucked to site with vaporization and storage. Recurring purchase and delivery logistics.

On-site generation

VPSA-based generation sized to demand. Supply control, lower delivery dependence, ongoing power and maintenance considerations.

Hybrid generation plus stored backup

On-site generation paired with stored or delivered oxygen for redundancy and peak coverage.

How Benchmark Oxygen Solutions works with the buying group

A long buying cycle, with one consistent set of answers

Continuity of supply, alarms, escalation, and operator workflow.

Service and ownership plan

Plan support before startup, not after

Service and maintenance

A planned maintenance approach that fits the site, the access window, and the on-site team's capability.

Spare parts

Critical spares planned around lead times, criticality, and operating profile.

Operating visibility

Remote diagnostics and alarm handling where available, with a clear escalation path.

Engineering and approvals

Documentation, FAT, and jurisdictional readiness

Some jurisdictions require pressure-equipment registration such as CRN (Canadian Registration Number). Requirements vary by location and project scope. Plan documentation and approvals early in the project.

Benchmark Oxygen Solutions does not publish recovery, cyanide-consumption, or savings figures without site-specific engineering review.

Plan the right gold mining oxygen strategy.

Start with a structured Oxygen Review. We will work through the demand, the site, and the supply strategy together.